Ian Kirk Diagram 105/125 Twin Set

This weekend saw much progress on the Twin set.

Timely posting of a photo of the brake end allowed me to cut the windows while the end was in the flat and then both coach bodies were assembled.

Kirk Twin Art – Diag 125

Kirk Twin Art – Diag 125

Kirk Twin Art – Diag 105

Kirk Twin Art – Diag 105

I also blanked of the inner ends by filling the holes for the buffers and coupling hooks and then overlaid a piece of 20 thou to form a solid foundation for the shared bogie pivot.

Kirk Twin Battery Box modifications

Lastly I made a start of building up/detailing the battery boxes (although there are five I only need four for this job). Next I need to cut out the end straps with the silhouette because I have run out.

A spring in the step,  or should that read, “some steps with the springs” (groan!)

 
We started with this.
 

Gladiator J6 – Replacement Ragstone Springs

 
I then patiently cut that down to get these separate pieces
 

Gladiator J6 – Loco spring modifications`

 
What I am aiming for is a 3D profile of these
 

Gladiator J6 – Replacement Ragstone Springs

 
Then I started to re-assemble them – and to misquote Eric Morecambe, all the right bits but not necessarily in the right order….
 

Gladiator J6 – Loco spring modifications -part 2

 
Monday evening should see them ready to fit (I hope!)

More Juice on the J6

Further progress has the chassis together and ready for the fitting of the hornblocks. 

Despite the quite substantial frames there was still a bit of flex in between the two main spacers and the rear one which is just soldered to the top left the bottom of the chassis with a tendency to splay outwards. To get over this I have temporarily soldered a third frame spacer (labeled motor spacer in and I also cut one of the wider frame spacers down and soldered it upright to take out the splay at the rear. 

As is comes there are three sets of spacers, marked from when it was blown up from a 4mm kit 00 gauge, EM gauge and P4 I am using the EM gauge spacers as a compromise between getting int to go around 5′ curves and having having sufficient room to fit the inside motion.

 

Gladiator J6 – Loco Chassis

Gladiator J6 – Loco Chassis

Before I go any further I am going to rework the springs and fit them before adding the Horn guides.

Gladiator J6 back on the Bench

As mentioned in my previous post a lack of time and energy has allowed me to do a few small jobs on the J6 that didn’t require anything that wasn’t therapeutic.

Although David had advised that it wouldn’t be available until March it was a pleasant surprise when an email suggested that it could be collected at Bristol show. Warren Haywood very kindly collected it for me, so the build has resumed. Perversely I have decided not to start with the tender but to get the loco frames done next – it’s to have working inside motion.

Parts of the etches do show their age and so it is with the loco springs which are a very basic etch. My client has asked me to build it as if it were for me so I have the discretion to obtain replacements for anything that I think could be improved upon.

The Hornblocks are Finney and were from stock so I will need to pick up some replacements for them from the Guys when I see them next.

Gladiator J6 – Loco Frames and Finney Horn Blocks

The spring castings are from Andy Beaton (@demu1037) at Ragstone Models and will be modified to make them look more like the J6 springs before fitting.

Gladiator J6 – Replacement Ragstone Springs

An update on LNER 06 Progress

Although I have made some progress on the chassis, recent minor surgery on my toe has left me struggling with the time/energy to give this the thought that it needs to get the motion assembled so I have been doing a few small jobs on the J6 until my energy returns

LNER 06 (MOK 8F) – Springs sand boxes and steam pipe

LNER 06 (MOK 8F) – Springs sand boxes and steam pipe

LNER 06 (MOK 8F) – Springs sand boxes and steam pipe

A Ventilated Diversion….

Alongside progressing the Kirk twinset (all three bogies are now to the same stage) I have also put together and painted/weathered an ex LMS Steel bodied Ventilated van.
It still needs couplings and some further work before I will have achieved my aim but I am pleased with progress so far.

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

Parkside LMS Steel Bodies Vent Van (Diag D1828)

More improvements to Kirk Bogies

When fellow modellers came along to see me when I was demoing at Pontefract show, the parts that I was cutting were some brakes for my Kirk coach bogies

Once glued together (5 layers) they came out looking like this.
Apologies for the poor photo, white on white isn’t the best combination
 

Silhouette cut brakes for Kirk Bogies

 
The demo must have been well received because I have also been asked to demo at Telford as well as Doncaster this year.
 
Not much modelling got done last week due to having a busy week compounded by minor surgery, but over the weekend the Mojo returned and I made progress on the twinset.
 

Scratch built Bolster Springs for Kirk Bogies

 
The first bogie now has it’s bolster springs an I have the parts prepared to fit to the other two. I did end up having to remove the bolster frame to fit the springs so a lesson learned.
 
I also managed to get three of the ends attached to their respective sides. The fourth one needs cutting down for the narrower brake end.