GCR Class 5A Pickups fitted Running slowly getting there.

I haven’t had much workbench time in the last couple of weeks or so but when I have I have been slowly working on the chassis of the Class 5A fitting the pickups and getting it to run. The latter being a bit of a trial.

In order to make it so that the motor and pick ups can be removed without having to unsolder anything I made a frame spacer from a spare out of another kit and screwed a piece of Vero board to it

GCR Class 5A Vero Board screwed in place
GCR Class 5A Pickups fitted
GCR Class 5A chassis

This is where the fun began,  despite it running lovely when the motor was connected directly as soon as I added pickups in to the equation the rods started jamming at every turn which in turn forces the compensation beams up and down to one extreme or the other. This caused more than a few mutterings. One thing that I noticed was that in retaining the Dereck Mundy Crankpins at the rear albeit in a modifified form on the centre axle the thick boss was still causing issues by pushing the coupling rods in to an open-ended wedge shape. I had dismantled one side with the plan to carefully extract the crank pins and turn the bossed down on my Unimat SL. Life intervened and I bought a Unimat 3 early last week, so having collected it from Driffield on Tuesday, I did them on that instead.

GCR Class 5A Crankpin boss turned down

It now runs much better on the rolling road but I am sure that once I get some weight in it and on a test track it will be fine. The rollers on my rolling road are set a lit far apart and sometimes that introduces a bit of a waddle which doesn’t help when trying to resolve running problems. – Prompted by typing this, I found and added some small washers which have taken out some of the side play on the rollers and running has improved already.