{"id":635,"date":"2013-10-13T13:26:46","date_gmt":"2013-10-13T12:26:46","guid":{"rendered":"http:\/\/www.railway-models-and-art.co.uk\/blog\/?p=635"},"modified":"2013-10-13T13:26:46","modified_gmt":"2013-10-13T12:26:46","slug":"in-interesting-sideline","status":"publish","type":"post","link":"http:\/\/www.railway-models-and-art.co.uk\/blog\/?p=635","title":{"rendered":"In interesting sideline"},"content":{"rendered":"<p>I am still waiting patiently for the drawing to arrive from the NRM (now a week beyond the extra week that they said it would take). I decided to have a tidy up and re-arrange on the work bench. having spent a couple of hours doing that I thought that I would do something small to see how the new arrangement worked &#8211; I have swapped my cutting mat and glass sheet that I solder on around to give more room for cutting.<\/p>\n<p>My little project was these.<\/p>\n<p><a href=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-003.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-636\" alt=\"LNER F8 003\" src=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-003.jpg\" width=\"916\" height=\"794\" srcset=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-003.jpg 916w, http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-003-300x260.jpg 300w, http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-003-346x300.jpg 346w\" sizes=\"auto, (max-width: 916px) 100vw, 916px\" \/><\/a> <a href=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-004.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-637\" alt=\"LNER F8 004\" src=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-004.jpg\" width=\"849\" height=\"822\" srcset=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-004.jpg 849w, http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-004-300x290.jpg 300w, http:\/\/www.railway-models-and-art.co.uk\/blog\/wp-content\/uploads\/2013\/10\/LNER-F8-004-309x300.jpg 309w\" sizes=\"auto, (max-width: 849px) 100vw, 849px\" \/><\/a><\/p>\n<p>I have some of the very nice CPL castings in stock but I wanted to try to make something that looked a little more North Eastern in origins.<\/p>\n<p>They are made from brass 10ba nuts, brass washers and the pin shanks from the heads that I used for the rivets on the frames &#8211; hows that for recycling? You may wonder why brass? It was because I only had 10ba steel nuts, no washers so I thought that I would test my idea for making them in brass before buying in some steel washers.<\/p>\n<p>Now that I have the route to making them &#8211; which is quite easy and doesn&#8217;t involve precision drilling with small drill bits I will do a small photo sequence of how I made them.<\/p>\n<p>They do look a little rough around them edges when magnified so much to to the naked eye they look fine &#8211; I could do a comparison of both these and the CPLS ones later too.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>I am still waiting patiently for the drawing to arrive from the NRM (now a week beyond the extra week that they said it would take). I decided to have a tidy up and re-arrange on the work bench. having &hellip; <a href=\"http:\/\/www.railway-models-and-art.co.uk\/blog\/?p=635\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-635","post","type-post","status-publish","format-standard","hentry","category-rising-starslaters-lner-f8"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=635"}],"version-history":[{"count":1,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/635\/revisions"}],"predecessor-version":[{"id":638,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/635\/revisions\/638"}],"wp:attachment":[{"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=635"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.railway-models-and-art.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}