Gladiator J6 Boiler and Smokebox Details

I am still beavering away at the J6. The boiler bands are on but despite having Tony’s build as a guide I added two 0.7mm infill pieces down the side of the smokebox as Tony had but initially made them too deep thankfully this was all done before attaching it to the smokebox so it was a simple matter to take it of and adjust it.

I made a new mounting plate for the snifting valve which it now fixed in place and I have made a start on fitting the very prominent set of bolt/rivet heads bellow it on the photo that I am working to. – They still need a bit more work with files to make them a bit shallower and more even.

Again, I followed Tony’s lead and started to drill out the chimney in my little lathe. Sadly I don’t have Tony’s touch because I had only got to a 4.5mm drill when I must have gone a little too deep and the spigot came away from the chimney. I attempted to make a collet from wood as suggested by Davis Smith (DLOS) but my chimney casting was ever so slightly misshapen and I couldn’t manage to get it to centre in my 3 jaw chuck (I don’t have a four jaw at present). 
I did the rest, the old-fashioned way and set to with a 2nd cut round file. In all honesty I think that it took less time to file it out than I had spent messing about trying to hold the casting to use a drill. I am just glad that I had drilled the base for the bolt heads before starting on drilling the inside or I may not have had the patience for it at that point.
Like the chimney casting the dome comes with a cast threaded spigot I suppose the original idea being that you would screw it to the boiler top. I opted to cut the spigot away and then using some emery paper wrapped around the boiler. I rubbed away at the dome until I got a good fit before cutting a couple of slots for the boiler band with a slitting disk in my Dremel.

Gladiator J6 Boiler Details


Not really much to show for all that work… as you will note it’s all just propped in place for the photo.