David Andrews Princess Royal – Still fitting the body details

Despite having a few things going on in the real world this week, I have made some steady progress on the body details.

While I had the boiler in place I fitted the front pipe clips for the vacuum ejector pipe.

David Andrew Princess Royal vacuum Ejector pipe

Then I fitted the pipes for the top feed which took quite a bit of filing to get them to sit snugly on top of the splasher without the boiler rocking.

David Andrew Princess Top Feed Pipe.

Then having removed the boiler I drilled a hole in the bottom of the elbow fitting for a small pipe which is visible on most photos no matter what period.

David Andrew Princess Royal vacuum Ejector fitting

That done, I moved onto fitting the twin oil boxes and their frames. This area still needs much cleaning done.

David Andrews Princess Royal Oilers fitted

Then it was the front vacuum pipe and associated pipework which was included as nice castings in the kit. I did make the bracket to hang it from the rear of the buffer plank after adding a pipe union from brass tube.

David Andrews Princess Royal Front Vacuum Pipe

Finally for this update I chose what I viewed as the easier set of pipework to add first. Not before I replaced the etched mounting brackets with some from flat bar after peering at photos and noticing that they were plates with two holes in them rather than straps wrapped around the pipework.

David Andrews Princess Royal Fitting Replacement Pipework

Now to work out how to fit the injector pipe on the other side.