Moving on from the last post has involved a bit more micro surgery in the form of boiler band cleats.
You do get etches for them in the kit and the suggestion is to tie them together with a length of 0.5mm wire. Me being me I had to make some nuts to go on each end…

And with the obligatory item for scale.
