On Bank Holiday Monday I took the one to be finished along to Harrogate show and again made excellent progress despite chatting to lots of people.
What I hadn’t realised at Redcar show is that although I had assembled parts 23,24, 25 and 26 into a sub unit and dry fitted fitted them I hadn’t actually soldered them in the second van. Sadly when I piked the van up to pack it away the sub assembly must have dropped off asI couldn’t find it at home when I discovered it’s was missing.
So I ended up scratch building a new sub assembly to replace the missing one.
I fitted a floor and then fitted the subassembly before fitting the rodding. Having prepared the parts before I went to Harrogate I did all the assembly during the show so didn’t get any photos of the subassembly after I put it together or without the rods in place. I replaced the two part etched crank with a piece of 10ba threaded rod (I have a number of short lengths from where I have shortened 1″ screws) with a wrap around that better represents the real thing.
Although there is a plan view of how the brake rods fit the small fitting that fits the upper rod to the bottom of the van isn’t provided so I knocked a couple up from scrap etch. Bending and soldering those last two short upper sections of rodding in place really challenged the patience and it’s a good job I was in public or I may have expanded my Anglo Saxon dictionary…